Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

Lehi City Lower School House Springs
Post-Bid
Lehi, UT 84043

Golf Course Sewer Replacement
Post-Bid
Saratoga Springs, UT 84045

Waste Pumping
Results
Provo, UT 84606

Salem City North Main Sewer
Results
$350,000 to $400,000 est. value
Salem, UT 84653

500 East 600 South Design
Post-Bid
Salem, UT 84653

Springville City 1120 South Sewer Project
Results
Less than $200,000 est. value
Springville, UT 84663

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

2020 Sewer Lining Project
Results
Less than $100,000 est. value
Highland, UT 84003

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

West Interchange Sewer Trunkline Design and Construction Management
Term Contract
Results
$7,000,000 est. value
Spanish Fork, UT 84660

Sewer Lateral Reinstatement and Robotic System
Post-Bid
Orem, UT 84057

Mt. Vista Parkway Sewer Reroute 2020
Results
Provo, UT 84606

30" Sewer Cipp Lining
Post-Bid
Eagle Mountain, UT 84005

2020 Water and Sewer Improvement Projects
Results
Provo, UT 84606

Last Updated 02/27/2020 12:50 PM
Project Title

2019 Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Orem, UT 84057   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000 to $1,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The WORK includes the installation of approximately 3,970 linear feet of 8” SDR35 PVC sanitary sewer pipe, 409 linear feet of 12” SDR35 PVC sanitary sewer pipe, (24) 60” Ø sewer manholes, (1) 48” Ø sewer manhole, 2,090 linear feet of 8” DI waterline, (4) fire hydrant assemblies, 200 linear feet of 12” SDR35 PVC storm drain pipe, 12 linear feet of 18” SDR35 PVC storm drain pipe, 82 linear feet of 21” SDR35 PVC storm drain pipe, 20 linear feet of 18” RCP irrigation pipe, (8) pre-treatment catch basins, (5) sumps, (4) concrete driveway approaches, and (5) ADA ramps. The engineer's estimate for the work is $1.7M to $1.9M. Location: The site of the work is located at Orem Boulevard (340 N to 400 N), the entirety of Monterey Drive, 600 North (Monterey Drive to Main Street), 500 North (Monterey Drive to Main Street), 70 West (450 North to 500 North), 75 East (800 North to 990 North), the entirety of Memmo Drive, and the entirety of 315 South.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents