Similar Projects
248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

248th Avenue - 95th Street to 103rd Street - SC190 - City of Naperville
Infrastructure, Renovation
Conception
$7,175,000 CJ est. value
Naperville, IL 60564

Dog Haus Restaurant
New Construction, Infrastructure - 651 SF
Design
$250,000 CJ est. value
Bolingbrook, IL 60490

Wayfair Fulfillment Center - Airport Logistics Center 2 / Romeoville
New Construction, Infrastructure - 1,200,000 SF
Design
$129,600,000 CJ est. value
Plainfield, IL 60544

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

Gould Street Water Main Replacement
Infrastructure
Results
$1,100,000 est. value
Beecher, IL 60401

Water Main Replacement Project 2
Infrastructure
Results
New Lenox, IL

Robert C. Hill Elementary School Addition and Renovations - Bid Group No. 1 Packages #1 through #2
Addition, Demolition, Renovation, Infrastructure
Construction
$3,095,712 CJ est. value
Romeoville, IL 60446

The Belvedere
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Naperville, IL 60564

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Farnsworth Avenue Bridge Phase III - City of Aurora
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Aurora, IL 60503

Biosolids Holding Tank - Phase 2 - WW042 - City of Naperville
Infrastructure
Conception
$1,500,000 CJ est. value
Naperville, IL 60564

Willow Tree Farm Subdivision / Plainfield
New Construction, Infrastructure - 21,759 SF
Design
$42,652,136 CJ est. value
Plainfield, IL 60544

2022 On-Call Excavation and Underground Utility Repair
Infrastructure
Post-Bid
Joliet, IL

Last Updated 06/20/2023 10:17 AM
Project Title

135th Street Water Main, Force Main, Storm Sewer and Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Romeoville, IL 60441   (Will County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,258,470 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

135TH STREET WATER MAIN, FORCE MAIN, STORM SEWER AND SANITARY SEWER IMPROVEMENTS No bid shall be withdrawn after the opening of the proposals without the consent of the Mayor and Board of Trustees for a period of ninety (90) days after the scheduled time of closing bids. All proposals shall be sealed in an envelope, addressed to the Village of Romeoville, attention Engineering Department. The name and address of the bidder, the name of the project, and "SEALED BID" shall all appear on the outside of the envelope. Proposals must be submitted on the forms provided by the Engineer. A bid bond or certified check/bank draft drawn on a solvent bank, payable without condition to the Village of Romeoville in an amount not less than ten percent (10%) of the bid shall be submitted with each proposal, as a guarantee that, if the proposal is accepted, a contract will be entered into, and the performance of the contract is properly secured. A performance bond in a sum equal to one hundred percent (100%) of the amount of the bid, with sureties to be approved by the Mayor and Board of Trustees for the faithful performance of the contract, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish bond upon acceptance of such bid or proposal. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the Mayor and Board of Trustees their best interests will be promoted thereby. The Contractor will be required to pay not less than the prevailing wage rates on this project as established by the United States Department of Labor. The Contractor shall also comply with all applicable Federal, State and local regulations. Pre-qualification will be required to be submitted to the Engineer by all potential bidders prior to receiving any bid documents. Bidder qualifications and experience will also be included in the basis for determining the lowest responsible bidder. If in the opinion of the Engineer and the Village of Romeoville, an applicant would not be able to serve the best interest of the Village, a proposal will not be issued to the applicant.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents